How is a project schedule developed?

Scheduling is the act of developing a schedule which is a series of tasks that need to be accomplished in a specific sequence within a given period of time. These tasks grouped together achieve a common goal on a project or program. Scheduling is one of the three main tasks of program management which are; Cost, Schedule, and Performance.

Scheduling is a key aspect of program management planning and is integral to a program’s Acquisition Strategy, Technical Baseline, Risk Management Plan (RMP), financial plan, and Requirements Development. It forms the foundation for executing the DoD Procurement (Acquisition, JCIDS, and PPBE) process and developing a program’s Integrated Master Schedule (IMS), Integrated Master Plan (IMP), and Work Breakdown Structure (WBS). In addition, scheduling is an important element of the other program management functions including; Organizing, Staffing, Controlling, and Leading.

Benefits of Scheduling

Effective scheduling supports the following key program management activities:[1]

  • Provides the basis for effective communications within the government team and with contractors
  • Identifies a baseline for program status monitoring, reporting, and program control
  • Facilitates management
  • Provides the basis for resource analysis and Resource Leveling, exploration of alternatives, and cost/time tradeoff studies

5 Steps for Schedule Development

There are a number of steps that are associated with the actual Development of a Schedule. These tasks should follow a structured approach and include all stakeholders. These tasks include:

  • Step 1: Activity Definition
  • Step 2: Activity Sequencing
  • Step 3: Activity Duration Estimate
  • Step 4: Schedule Development
  • Step 5: Schedule Control

How is a project schedule developed?

Scheduling Topics

Program Managers (PM) must have a good working knowledge of scheduling practices and applications (such as Gantt, Milestone, and Network Diagrams) in order to achieve program goals. Tasks that should be understood by a PM include:

  • Integrated Master Schedule (IMS)
  • Work Breakdown Structure (WBS)
  • Earn Value Management (EVM)
  • Schedule Risk
  • [1] Defense System Management College “Scheduling Guide for Program Managers” – Oct 2001
  • DoD “Integrated Master Plan and Integrated Master Schedule Preparation and User Guide” – 21 Oct 2005
  • CDC “Project Scheduling Best Practices/Guide” – 30 Jun 2007
  • GAO 16-89G “Schedule Assessment Guide” – Dec 2015
  • GAO 12-120G “Schedule Assessment Guide: Best Practices for Project Schedule” – May 2012

Updated: 7/14/2021

Rank: G1

Running a project can feel a lot like herding cats with a laser beam: chaotic and random at best.

Not if you’re using a project schedule though. A proper one clearly outlines the activities that need to be done, their order, the resources involved, and how long it takes to complete them.

Much like a blueprint to benchmark against future progress or risks that might derail the project’s initial scope – which is what usually happens in project management.

So how do you develop a project schedule that is simple enough to be understood by all stakeholders, yet detailed at the same time to be followed by those who execute it?

Let’s check the theory first, and in the second part we’ll have a look at a practical example.

Project schedule steps

While defining activities, sequences, resources, and activity timelines are viewed by the PMBOK as individual processes with inputs, tools, and output. This only applies to complex and long-term projects where unsupervised changes can turn into hairy problems overnight.

For simpler ones, you’re better off with a single, holistic process like in the infographic below:

How is a project schedule developed?

6 steps to develop your own project schedule

Let’s see what each individual step is all about.

1. Define the Work Breakdown Structure (WBS)

The work breakdown structure (WBS) is the foundation of every project schedule. It implies breaking down the work to be done into smaller chunks that are easier to track and manage.

This builds control points throughout the whole project, so project managers know what deliverables to focus on, while clients have a clear picture in terms of what to expect in return for their money.

Defining the WBS is possible through a technique called decomposition, which basically peels off the structure like an onion to reveal the following layers:

Work packages represent the smallest unit of work within a WBS. They are related to each other and contribute together to the actual completion of a deliverable. Like “building the foundation” is for the erection of a house.

Activities, which are further down the road, spell out the effort it takes to complete a work package. By default, each one should come with a description to define the scope of work, as well as additional attributes – like the resources assigned, duration, costs, and dependencies – which will be later specified in the project schedule. So stick with the task description for now.

Milestones, unlike activities, don’t have a duration yet remain on the same level with them. They represent a major event during the project life cycle that can either be mandatory, say the approval of a storyboard imposed by the client, or optional, like a testing phase before a feature deployment that you’ve figured is a good practice.

2. Sequence activities

Once all activities have been identified, it’s time to sequence them.

Before doing so, remember that each activity needs to have a predecessor (except for the first one, which marks the start of the project) and a successor (except the last one, which marks the end of the project). The same goes for milestones. Also, take into account certain logical constraints that prevent some activities to happen before others do. For example, you can’t work on a project before meeting with your client to find out their requirements in the first place.

This being said, there are 4 types of dependencies you can use:

  • Finish-to-Start (FS) – By far, this is the most common type of dependency, which states that the predecessor activity must finish before the successor can start. If you don’t want to create a convoluted project schedule, stick with this one to do the heavy lifting for you.
  • Finish-to-Finish (FF) – In this case, a successor activity can’t end before the predecessor ends. This usually means that activities will run in parallel, with a portion of the work to be delivered before the other one is completed.
  • Start-to-Start (SS) – In this case, a successor activity can’t start until the predecessor starts. Again, this means that activities will run in parallel, with a portion of the work to begin after the other one begins.
  • Start-to-Finish (SF) – Rarely used in project management, it implies that the predecessor activity must start before the successor ends. The cases are extreme, hence refrain from using it to avoid any confusion later on.

To learn more about task dependencies with real-life examples, read our article.

Luckily, you can overwrite them through lag and lead time. Lag refers to the time added between a predecessor and a successor (a delay), while lead time refers to the amount of time a successor can be advanced with regard to its predecessor (an overlap).

Although handy in critical situations when you’re tight on time, these scheduling methods should be used with caution. Lag time, for instance, should never be used in a Finish-to-Start (FS) dependency, as the delay should be incorporated inside an activity’s duration. Otherwise, you’ll have a hard time monitoring the entire project schedule and account for future changes.

To continue with our house example, “setting tiles for a bathroom” with an FS logic to “painting the walls” has a 3-day lag. This means that waiting until the paint dries is not incorporated in the initial task duration, but hidden in the actual dependency.

Note: Floating activities without any predecessor and successor also exist. Inoffensive at first, they’re actually capable of delaying the entire project if their duration exceeds the project duration. You wouldn’t “coat the roof beams with fireproof paint”  when handing over the house keys.

3. Identify resources

The goal here is to identify the type of resource and amount of work required for each activity – be they human, supplies, or materials.

When choosing the right type of resource, don’t be fooled by how good things look on paper. Always probe for your team’s skills, knowledge of industry processes, and proficiency in a certain tool, as this step is closely tied to how you’ll estimate costs later. Hire an inexperienced developer for example, and you run the risk of inflating your costs through training classes, or even worse, hire an external contractor until they ramp up to full-speed.

You also need to take into account their availability during the project life cycle, including leave days, so you know whom to rely upon. However, there are simple apps for scheduling resources like the ones from this list of resource management tools.

As for the amount of work required, this has to do more with the number of hours or physical units it takes to complete an activity. Whether this needs to be tackled by one or more resources is irrelevant and can be later determined through a resource plan.

4. Estimate activity durations

So far, we’ve only gathered “ingredients” for the project schedule without actually developing it. The last step before this is to estimate activity durations, which summed up will give you a better picture of how long it takes to deliver the project.

A classic mistake is to assume that every resource works at 100% capacity, a far-reachable goal even for the most project-oriented organizations. In fact, working over 40 hours/week has been proven by many scientific journals to increase the risk of cardiovascular diseases, depression, and eating disorders. So use some common sense and account for 70-80% efficiency for realistic, or should I say “human” results.

In terms of the actual estimating process, take advantage of the historical data from your previous projects like the budget, costs, and complexity implied. This works well for projects similar in structure and with an experienced team, yet not advisable due to its low level of accuracy.

For something more precise, use the three-point estimation method that takes into account the activity durations in relation to their outcome of completion:

  • Most likely (M) – Based on the current activity attributes and resource constraints
  • Optimistic (O) – Minimum time required to complete an activity (best-case scenario)
  • Pessimistic (P) – Maximum time required to complete an activity (worst-case scenario)

The final weighted formula – (O + 4M + P)/6 – renders a higher likelihood of the project being delivered on time.

Note: If you’re a business owner and want to get better at estimations, schedules, and workload, choose an online or computer-based time tracking software for employees. One common reason is that project and work management software have come a long way. They have been tested for efficacy and excel in time-tracking, reporting, and invoicing. Many users like billing and invoicing software due to its accessibility and ease of use. Others opt for an online invoice generator, although an invoice builder is available in fewer languages.

If you piece all things together so far, you should end up with a network diagram similar to the one below:

How is a project schedule developed?

Network diagram

5. Develop the project schedule

With the WBS, dependencies, resources, and estimates in place, it’s time to develop the actual project schedule. There are a couple of project scheduling techniques to make sure you’re acting within the boundaries of the scope-time-budget triad, while also keeping quality in check.

Critical Path Method

The Critical Path Method (CPM) depicts the minimum amount of time it takes to complete a project. It does so by analyzing the earliest and latest start and end dates of each activity, then goes back-and-forth between them to determine the optimum path to choose – the critical path.

Beware though. Activities that show up on the critical path are not necessarily the most difficult or expensive ones. But rather those which, if take longer to complete, will delay the project duration.

Each activity though can have a float or slack, i.e. the number of days it can be extended without delaying the actual project or violating certain resource constraints. That’s why the CPM is designed to test the project schedule’s flexibility without altering its baseline.

Program Evaluation and Review Technique

Like the CPM, the Program Evaluation and Review Technique (PERT) is built on top of a network diagram. However, this one is a little bit more realistic as it takes into account the weighted average duration of an activity rather than its actual duration.

It does so by also weighing in the best and worst-case scenarios in relation to the desired outcome, rendering the estimating formula we’ve discussed in the previous step.

Duration compression

Duration compression is, you guessed it, a way to reduce the project duration by implicitly reducing the duration of each activity on the critical path. So you can still meet your deadlines without compromising on the project scope. There are two common techniques:

  • Crashing – Where you bring in new resources or pay overtime to deliver the project on time. Although feasible at first, crashing significantly increases the overall project cost and complexity, due in part to the effort it takes to manage the additional resources.

How is a project schedule developed?

Crashing technique

  • Fast tracking – Where you deliberately overlap two consecutive activities so they happen in parallel for a portion of time. Beware though, as this might result in rework and increased risk, forcing you to sacrifice quality for the sake of meeting deadlines.

How is a project schedule developed?

Fast tracking technique

Resource optimization

Resource optimization techniques take into account the available supply and demand for resources and how they can shorten the project duration. There are two common ones here as well:

  • Resource leveling – Refers to adjusting the project schedule in such a way as to balance any over-or under-allocated resources.This is usually done by rearranging activities in a different sequence (in case a resource is overburdened) or changing the activity durations altogether, so only the critical ones get the necessary resources (in case there aren’t enough resources). Unfortunately, this will increase the critical path’s length and overall costs.

How is a project schedule developed?

Resource leveling technique

  • Resource smoothing – Quite the opposite of the previous one, it implies adjusting the resources in such a way as to not exceed an imposed resource limit.This technique is primarily used when you can’t extend the project schedule. Because of this, the critical path will remain the same, meaning that activities can’t be delayed beyond their total float. Yet, not all resources can be “smoothed” in real life, hence resource smoothing is rarely recommended.

How is a project schedule developed?

Resource smoothing technique

6. Review the project schedule

Once the project schedule is complete, it’s time to review it at periodic intervals – a process that will help you correct deviations from the initial baseline and minimize risk in the long run. Here’s a couple of review techniques to choose from:

What-if scenarios – Address different situations and their effects that might delay the project. These can be anything from a major delay or a contractor getting out of business. You can then use the results and prepare contingency plans to protect yourself against these risks.

Trend analysis – As its name suggests, this technique looks at the project performance over a specific period of time to see whether it’s improving or lagging. Some of the parameters analyzed are the actual start and finish dates, the percentage of completed activities, and the remaining project duration.

Critical Chain Project Management (CCPM) – Considers the shortage of resources by adding buffer time to each activity, which can then be used to address sudden changes. As a result, the critical chain represents an altered form of the critical path with resource-leveling in place. That’s why this time you’re not looking to manage the remaining float, but the difference between the remaining buffer and activity durations (those on the critical chain).

How to develop a project schedule in Paymo

Phew, that’s a lot of files to keep in order and techniques to remember. Luckily, there’s a better way to develop a project schedule without losing your sanity: via project management software.

The clear advantage of a tool like this is that you’re able to draw more complex diagrams than you could with just a pen and paper. The reviewing process also becomes much more efficient, as data keeps feeding the system so you’re better equipped to make the right decisions.

If you need to create a project schedule in just a few steps, then Paymo is the right tool for you.

Create a project schedule in just a few steps. Sign up for Paymo.

Let’s see how.

1. Define the Work Breakdown Structure (WBS)

The first thing to do is map out the WBS of a project. Here’s how each element of the structure translates in Paymo:

  • Work packages → Task lists
  • Activities → Tasks
  • Milestones → Milestones

To explain them in more detail, task lists act as the main deliverables, which is why it’s a good practice to define them using a “noun-verb” structure, so the outcome is clear.

Task lists are further broken down into tasks, which have their own attributes like assigned users, start and end dates, and task hourly budgets to be filled as you create the project schedule. Simply hover over a task and you’ll access them in the form of quick action icons.

How is a project schedule developed?

Task structure Paymo

A good practice is to list all the tasks in the order in which they’re going to be sequenced, something that will help us at the next step.

Milestones, on the other hand, are directly tied to a task list, acting more as a reminder on top of the work package that should be monitored by a responsible person (usually the project manager).

How is a project schedule developed?

How to add a milestone in Paymo

2. Sequence activities

At this point, you should have a list with all the tasks displayed in the order of their starting point.

To sequence tasks, one after another, first, change from List to Gantt Chart (top right corner).

Don’t panic though, the timeline is empty because we don’t have any task durations yet. So for now, set each task duration to the smallest unit possible (1 day) through a click and drag on the timeline. We’ll take care of the actual durations at a later step.

Repeat this for every task and you should have something like this:

How is a project schedule developed?

Gannt Chart View in Paymo

A few words about the graphical representations:

  • Blue rectangle stands for the project
  • Gray rectangle stands for task lists
  • Circular tubes stand for tasks (green – on track, red – off track)
  • Yellow diamond stands for milestones

Good, we’re now ready! To create a dependency between tasks, hover over a task until two circles appear at the front and end.

How is a project schedule developed?

Task dependency (1) in Paymo

Then unite it with the circle of another task according to the type of dependency that you want to set. Paymo supports all four (FS, FF, SS, SF), but I’m going to stick with the popular finish-to-start one for simplicity and do the same for the rest.

How is a project schedule developed?

Task dependency (2) in Paymo

But say you want the “Design” and “Front-end development” tasks to overlap for 1 day. After all, developers can already take a glance at the existing assets and start coding before the final ones are submitted. What then?

Luckily, Paymo allows you to set gap time in the form of lead and lag time.

To do so, click on the dependency and either add a negative number (lead time, a.k.a. overlap time) or a positive number (lag time, a.k.a. delay time).

How is a project schedule developed?

Gap time setting in Paymo

I go for the first option, an action that will turn the dependency from yellow to magenta to signal this change. Again, proceed with caution when doing so, as buffers and lags are not accounted for in the initial task duration, hence becoming hard to monitor as the project evolves.

How is a project schedule developed?

Lead time in Paymo

3. Identify resources

Before assigning team members to tasks, make sure that they’re available in the first place.

Check for the remaining hours under the Team Scheduling module (sidebar menu), right in front of each of their avatar. The resource scheduler also accounts for their leave days – the hachured areas – so you know who to rely upon or whether you should bring in additional resources.

How is a project schedule developed?

Resource availability bar in Paymo

PRO TIP

If you only want to see your team’s availability without the tasks they’ve already been booked for, click on the dropdown button in front of the Users table head (top left).

Alright. Now that you’re aware of this aspect, get back to your project and switch back from Gantt Chart to List (top right corner). Then hover over a task and click on the Assign To icon to assign one or more responsible users.

How is a project schedule developed?

How to assign users in Paymo

NOTE

The users need to be assigned to the project first, so you can further assign them to a task.

The reason why we did this was that it’s much faster to do it here than on the timeline, where you have to double-click on every task name to access the full task details.

4. Estimate activity durations

With tasks and team members in place, the next step is to estimate the task durations individually.

Look back at similar projects that you’ve dealt with in the past to get an initial ballpark figure. Then use some common sense – people can’t work at 100% capacity – in parallel with the three-point estimate formula to create realistic, achievable estimates.

When you’re done, hover over a task and click on the Set Dates icon to select a start and end date for its completion.

How is a project schedule developed?

How to set a task date range in Paymo

You can also switch back to the Gantt Chart and pinch the task ends to extend or shorten them, or glide over the timeline to change their duration altogether.

How is a project schedule developed?

Invalid task dependency in Paymo

Notice something? There’s an invalid dependency highlighted in red, as the task “Front-end development” ends on the same date when the task “Back-end development” starts – 18th December.

One way to fix it would be to add a lead time and allow them to overlap for 1 day. But I don’t want that. The same resource, Mark, is working on the next task too, so I want to separate them to avoid confusion and give him some rest.

The best course of action, in this case, is to forward the latter task either manually or through the auto-scheduling functions under the More button. The Auto option takes into account all the lead and lag time, while the Auto-strict one ignores it.

I go for Auto which keeps the lead time between the “Design” and “Front-end development” tasks, while moving the “Back-end development” task forward with 1 day.

How is a project schedule developed?

Auto scheduling setting in Paymo

5. Develop the project schedule

The network diagram is now complete. What’s left is to come up with the best route to complete the project given the current resources and time constraints. As you’ve probably guessed, Paymo allows you to define the critical path in a few seconds.

Just click on the More button (top right) and check the Critical path option.

How is a project schedule developed?

How to determine the critical path in Paymo

What you’ll see is the longest path to complete the project, which takes into account the lead and lag time as long as you didn’t use the Auto Strict scheduling function.

How is a project schedule developed?

Critical path for a project in Paymo

In this case, the critical path starts with “Research” and ends with “Back-end development”. The tasks in this chain are all “critical” because if one is delayed the project will also be delayed.

TIP: There

6. Review the project schedule

Congrats! You’ve just created the project baseline. A good practice is to export it as a PNG/SVG file from the Export as a button, so you can compare it against further changes to the project timeline.

This function also proves useful when clients require a status update right before an important milestone.

How is a project schedule developed?

How to export a Gantt Chart in Paymo

Speaking of keeping deliverables on track, Paymo gives you the opportunity to view the time registered against a task through the Worked from total column. This acts as an extra control point for project managers, besides milestones, to monitor the project progress in real-time.

How is a project schedule developed?

Worked from total column for Gantt Chart in Paymo

One thing I didn’t mention is that the techniques used to create the project schedule at the previous step (under the theoretical part) can also be used when reviewing it – specifically, resource leveling.

This is possible thanks to the Team Scheduling module that shows you whether someone is over-or under-booked for a given day.

How is a project schedule developed?

Remaining user availability in Paymo

Paymo limitations

Creating a project schedule in Paymo is not perfect. Here’s a few things that would make the system fool-proof:

  • Save the project baseline and track deviations in-app, without having to export the project timeline first and manually compare it with the current project schedule.
  • Display milestones also at the end of a task – right now they’re only displayed after a task list since it’s directly tied to it.
  • Remaining bookable hours column for each user, so it’s much easier to perform resource leveling with a burndown graph of their total availability per week or per month in front of you [COMING SOON]  [AVAILABLE NOW].

NOTE: For software that remembers baselines with task hourly budgets, try other Gantt diagram tools.

Put your knowledge into practice

Now that you’re armed with fresh knowledge, it’s time to put it into practice. Look back at one of your previous projects and draw a network diagram now that you’re aware of the outcomes.

Or try creating your own virtual one and sign-up for a free trial in Paymo.

Whether you define it with pen and paper or use a project management tool to do so, the task of creating a project schedule is as real as it gets. So take your time to understand first, then implement it as a way to protect yourself against future risks.

What is schedule development process?

Steps to Developing a Project Schedule Step 1: Create a work breakdown structure. Step 2: Estimate durations. Step 3: Determine resources. Step 4: Identify predecessors. Step 5: Determine milestones.

When should the project schedule be developed?

When should the project schedule be developed? A As early into the project as possible. A committed schedule should be there before any initiating or planning processes are applied for the project.

What are are some key steps in developing a project schedule?

6 Steps to the Project Scheduling Process.
Define the Project. ... .
Sequence Project Tasks and Milestones. ... .
Define the Critical Path. ... .
Allocate Necessary Resources. ... .
Build a Timeline. ... .
Track Progress and Adjust the Schedule as the Project Progresses..

What are the five steps in project scheduling?

These stages include:.
initiation..
planning..
execution..
monitoring and control..
closure..